ZENLITHIC SolarSign in

Zenlithic Solar Blog

Solar engineering guides

Solar PV design calculations with formulas, worked examples and checklists.

Solar Engineering

How to Prepare a Solar SLD (Single Line Diagram) — Step by Step with a 2.5 MW Example

A step-by-step guide to preparing a solar plant single line diagram (SLD) — the DC, LT and HT sections, protection, metering, earthing and ratings — illustrated with a 2.5 MW plant example.

Zenlithic Solar Engineering Team
Solar Engineering

Solar Transformer Sizing and Selection (kVA, Impedance, Losses — 2.5 MW Worked Example)

How to calculate the kVA/MVA rating of a solar step-up transformer, choose impedance and vector group, estimate losses and fault levels — with a verified 2.5 MW plant example.

Zenlithic Solar Engineering Team
Solar Engineering

Strings per MPPT: How Many Solar Strings Can You Connect in Parallel? (Worked Example)

How to calculate the number of strings per MPPT and per inverter — operating current, short-circuit current, bifacial gain, string fuse requirements and orientation rules — with a verified worked example.

Zenlithic Solar Engineering Team
Solar Engineering

GHI, DNI, DHI and POA Irradiance Explained (with a Worked Transposition Example)

What GHI, DNI, DHI and POA irradiance mean, how they relate, how tilted-plane irradiance is calculated from them, and which one to use in generation, PR and PVsyst — with a verified worked example.

Zenlithic Solar Engineering Team
Solar Engineering

kW vs kWp vs MW vs MWp in Solar (and kVA, kWh, MU) Explained with Examples

The difference between kW, kWp, MW, MWp, kVA, kWh and MU in solar projects — what each measures, where each belongs in a proposal or tender, and a worked 5 MWp / 4 MWac example.

Zenlithic Solar Engineering Team
Solar Engineering

Solar Row Spacing, Pitch and GCR Calculation (Tilt and Shadow Analysis Worked Example)

How to calculate solar row spacing, pitch and GCR from sun position — winter-solstice shadow analysis, tilt trade-offs and land density — with a fully worked example for a fixed-tilt plant in Jaipur.

Zenlithic Solar Engineering Team
Solar Engineering

Solar PR, CUF and Generation Calculation (5 MWp Worked Example)

How to calculate solar plant generation, performance ratio (PR), specific yield and CUF — with a complete 5 MWp / 4 MWac worked example, an explicit loss chain and clearly stated assumptions.

Zenlithic Solar Engineering Team
Solar Engineering

Solar Cable Sizing and Voltage Drop Calculation (DC and AC Worked Examples)

How to size DC string cables and AC/HT cables for solar plants — design current, derating, voltage drop and loss formulas, short-circuit withstand, copper vs aluminium — with complete worked examples.

Zenlithic Solar Engineering Team
Solar Engineering

DC/AC Ratio and Inverter Sizing for Solar PV Plants (Clipping, MPPT and Worked Example)

A practical engineering guide to DC/AC ratio (inverter loading ratio) and inverter sizing — MPPT input limits, clipping threshold calculation, reactive-power headroom and a worked 10 MW example.

Zenlithic Solar Engineering Team

Zenlithic Solar Engineering is part of the Zenlithic ecosystem.