Zenlithic Solar Engineering

One engineering workspace, three portals, one source of truth.

Developer, EPC and Consultant all work off the same Site → Design → Layout → SLD → BOQ chain — with revision control, so a mid-project change is tracked, not silently lost.

Engineer conducting a rooftop site survey with a tablet
Site Survey

Roof and ground conditions assessed before design begins.

Slide 1 of 5: Site Survey

The engineering chain

  1. 1Site
  2. 2Design
  3. 3Layout
  4. 4SLD
  5. 5BOQ
Engineer reviewing solar layout drawings and single-line diagrams at a desk

Portals

Team collaborating around a laptop reviewing a solar project dashboard
Developer

Create the project, assign an EPC and a Consultant, track progress.

EPC

Author Site survey, Design, Layout, SLD and BOQ for assigned projects.

Consultant

Review and approve Design/SLD/BOQ before they lock in.

Solar engineering guides

Worked calculations from our design team — string sizing, inverter sizing, cable design, energy yield and layout.

All solar engineering guides →
How to Prepare a Solar SLD (Single Line Diagram) — Step by Step with a 2.5 MW Example

A step-by-step guide to preparing a solar plant single line diagram (SLD) — the DC, LT and HT sections, protection, metering, earthing and ratings — illustrated with a 2.5 MW plant example.

Solar Transformer Sizing and Selection (kVA, Impedance, Losses — 2.5 MW Worked Example)

How to calculate the kVA/MVA rating of a solar step-up transformer, choose impedance and vector group, estimate losses and fault levels — with a verified 2.5 MW plant example.

Strings per MPPT: How Many Solar Strings Can You Connect in Parallel? (Worked Example)

How to calculate the number of strings per MPPT and per inverter — operating current, short-circuit current, bifacial gain, string fuse requirements and orientation rules — with a verified worked example.

GHI, DNI, DHI and POA Irradiance Explained (with a Worked Transposition Example)

What GHI, DNI, DHI and POA irradiance mean, how they relate, how tilted-plane irradiance is calculated from them, and which one to use in generation, PR and PVsyst — with a verified worked example.

kW vs kWp vs MW vs MWp in Solar (and kVA, kWh, MU) Explained with Examples

The difference between kW, kWp, MW, MWp, kVA, kWh and MU in solar projects — what each measures, where each belongs in a proposal or tender, and a worked 5 MWp / 4 MWac example.

Solar Row Spacing, Pitch and GCR Calculation (Tilt and Shadow Analysis Worked Example)

How to calculate solar row spacing, pitch and GCR from sun position — winter-solstice shadow analysis, tilt trade-offs and land density — with a fully worked example for a fixed-tilt plant in Jaipur.